The original Post and Beam, infrastructure, Vine Church built at Hiawatha and Lake St., moved to 2019 E. Lake before additions were made making the building”'s shape less obvious are revealed in this photo during demolition for the land fill without any salvaging of materials! City required spraying with water during demolition to control contaminants, including lead, was not done by the Contractor or enforced by the Mpls. Schools Facilities Dept! The site is surrounding by a shopping center, YWCA, South High School and Athletic Field, and Pioneers and Soldiers Cemetery.
Tuesday September 10th 2024